Can foreigners invest in Indonesia? Yes, and the mechanism is settled: a foreign investor holds shares in a PT PMA, an Indonesian limited liability company, and most sectors permit 100% foreign ownership. That answer covers half of what a manufacturer is actually asking. The other half, what that company can then put its name on in land, has a different answer and a different legal basis.
This guide separates the two. It covers the company layer and the land layer, Indonesia’s ladder of land rights and which one a foreign-invested company can hold, how an industrial plot actually transfers to a foreign buyer, why the estate route is the default for manufacturers, and where SIIPE sits today as a developer whose land certification is still in process.
Last updated: 21 October 2026
Can Foreigners Invest in Indonesia? The Short Answer
Can foreigners invest in Indonesia? Yes. Three separate permissions sit inside that one question, and collapsing them is the most common error we see in a first enquiry.
| The question you are really asking | The answer | Where it comes from |
|---|---|---|
| Can a foreigner own an Indonesian company? | Yes, up to 100% in most sectors, through a PT PMA | Positive Investment List, Perpres 10/2021 as amended by Perpres 49/2021 |
| Can a foreigner own Indonesian land outright? | No. Not personally, not through any structure | Basic Agrarian Law, Law No. 5 of 1960 |
| Can a foreign-owned company hold land? | Yes, as a registered right to build, not as ownership | PP 18/2021 |
So when a manufacturer asks “can foreigners invest in Indonesia?”, the working answer is this. You will not own land in Indonesia, and neither will your PT PMA. Your PT PMA will hold Hak Guna Bangunan (HGB), a registered, transferable, mortgageable right to build for a defined term. For a factory with a 25-year asset life, that distinction costs you less than it first sounds. It changes your due diligence, not your investment case.
The Company Layer: What a PT PMA Can and Cannot Hold
Every foreign manufacturer entering Indonesia does so through a PT PMA, a limited liability company with foreign shareholding, administered by the Ministry of Investment, still widely called BKPM. It is not one option among several. Any company with foreign shareholders takes this form.
Sector eligibility is governed by the Positive Investment List. Introduced by Presidential Regulation 10 of 2021 and amended by Presidential Regulation 49 of 2021, it replaced the old Negative Investment List and reversed the default so that sectors are open to 100% foreign investment unless a limitation is specified. As of 2026 no later presidential regulation has replaced it.
The operative unit is not the industry. It is the KBLI code, Indonesia’s five-digit business activity classification. Your KBLI code determines the foreign ownership ceiling, the risk category and the licences you need, so “manufacturing is open” is not a finding. The finding is whether the specific code is open, and that should be settled before a site shortlist hardens.
Capital thresholds, NIB issuance and the OSS-RBA licensing sequence sit outside this guide. What the company layer does not deliver is land, and that is where most answers to “can foreigners invest in Indonesia?” stop too early. A PT PMA with a clean NIB, a fully open KBLI code and capital deposited still cannot be entered in the land register as an owner. That is the next layer, and it is governed by an entirely different statute. For the sequence itself, read our guide to how to invest in Indonesia as a foreigner, which takes the PT PMA from deed to NIB.
The Land Layer: Indonesia’s Land Rights Ladder
Indonesia has no single concept of property ownership. It has a ladder of registered rights, created by the Basic Agrarian Law of 1960 and rebuilt for the current era by Government Regulation No. 18 of 2021 on Management Rights, Land Rights, Strata Title and Land Registration, which took effect on 2 February 2021 and remains in force. Each rung has its own eligible holder and its own term.
| Right | What it is | Who can hold it | Term |
|---|---|---|---|
| Hak Milik (SHM) | Freehold ownership | Indonesian citizens and designated bodies only | Indefinite |
| HGB | Right to build and own structures | Indonesian legal entities, including a PT PMA | 30 years, extendable by 20, renewable by 30 |
| Hak Pakai | Right to use | Individuals, including foreign nationals, and entities | Comparable terms, narrower use |
| HGU | Right to cultivate, for plantations | Indonesian legal entities | Longer, structured for agribusiness |
| HPL | Management right over state land | State bodies, and estate companies that are state or regionally owned | Basis for granting HGB above it |
| Hak Sewa | Contractual lease | Anyone | Per contract, not a registered title |
HGB is the rung that matters to a manufacturer. It is issued as a certificate, registered with the National Land Agency, and Indonesian banks accept it as security. No other right available to a foreign-invested company combines that term length with that bankability.
Two points a finance director will ask about. First, the extension is not automatic: an application goes to the land agency before expiry, and productive use of the land is assessed. Second, where a PT PMA acquires a parcel currently held as Hak Milik, the title does not travel with it. It is released and re-granted as HGB, because a company cannot hold Hak Milik at all.
Evaluating northern Sumatra? Our investment team can set out the title structure that would apply to a specific plot, before engineering time goes into it. Request an investor call.
How Industrial Land Actually Transfers to a Foreign Buyer
Knowing that a PT PMA takes HGB does not explain how the plot reaches it. In practice there are two routes, and they carry different timelines.
- Route one, a plot HGB split out of the estate’s own title. The estate company holds HGB over the estate, and that title can be split into a separate right to build for each individual plot under Government Regulation No. 20 of 2024 on Industrial Regionalisation, which took effect on 7 May 2024 and replaced the 2015 industrial estates regulation. The split is carried out by the estate company, and the resulting certificate is registered to the tenant’s PT PMA. This is the route for a privately developed estate.
- Route two, HGB granted over a management right. Where the estate company is a state-owned or regionally-owned enterprise, it may instead be granted HPL, with HGB then granted above it, per plot or per group of plots. The regulation ties this route to public ownership of the estate company, so do not assume a private developer can offer it. Ask which of the two the estate is actually using, because the answer changes who holds the underlying title for the next 30 years.
Either way the transaction runs through a Land Deed Official (PPAT), is sealed in a sale and purchase deed, and takes legal effect only on registration at the land agency. Budget for the buyer’s land and building acquisition duty (BPHTB) and the seller’s final income tax (PPh Final), and confirm the current rates with the PPAT rather than with a published guide.
Here is the sequencing point that costs foreign buyers the most time. HGB cannot be issued over a parcel still recorded in an individual’s name as SHM. The release and re-grant is a separate process at the land agency with its own queue, and it runs before the building permit, not alongside it. A 20 Ha requirement that straddles two parcels with different document status inherits the slower of the two. Teams that count permit time from the date of the sale deed are routinely three to six months optimistic.
Why the Estate Route Is the Default for Manufacturers
Foreign manufacturers rarely buy industrial land directly from individual landowners, and the reason is partly legal rather than commercial. Indonesia’s Law No. 3 of 2014 on Industry, as amended by Law No. 6 of 2023, directs industrial activity into designated industrial estates, and the current implementing regulation requires an estate to sit inside a zone allocated for industry under the regional spatial plan (RTRW). Estate selection is therefore a regulatory decision before it is a real estate one.
The contrast with raw greenfield land is where the cost sits. Buy a field directly and the buyer carries the zoning conformity check, the release and conversion of every prior title, the community claims, the utility tie-in from wherever the nearest connection happens to be, and a standalone environmental approval. Buy a serviced plot inside an estate and most of that has been absorbed, which is the difference between ready-to-build land and land that merely looks buildable.
What an estate genuinely absorbs, and what it does not, varies. An estate can hold the title structure, the zoning conformity, the infrastructure and the licensing support. No estate grants a government approval or an incentive. If a developer’s materials suggest otherwise, that is a signal about the rest of the document.
What This Means at SIIPE
SIIPE (Sumalacca Integrated Industrial and Port Estate) is a planned 5,600-hectare industrial estate, bulk port and township on the Strait of Malacca in Medan Belawan, North Sumatra, of which roughly 840 hectares has been acquired to date. Belawan Port is 4.7 km away, about 10 minutes by road. We are the landowner and developer, not a broker.
We will not claim the title is ready, because across the estate land certification is still in process. Parcels currently sit under different documents: some registered SHM, some held under a District Head Certificate, which is a local land letter rather than a registered title and must be registered before anything is granted over it. The current zoning and title status by masterplan component sets out where each one stands.
The practical step is short. Ask which component the plot sits in, what document it carries today, and which of the two transfer routes above would apply, because the answer to that last question sets your earliest realistic handover date. Two further points a diligence team will check, so we state them plainly.
SIIPE welcomes 100% foreign investment as an estate position, but your actual eligibility depends on your KBLI code under the Positive Investment List, not on us. And SIIPE does not hold special economic zone status: our KEK and free trade zone application is in process and has not been granted, which is why KEK incentives and their conditions should stay out of your business case until designation is confirmed.
Frequently Asked Questions
Can foreigners invest in Indonesia without an Indonesian partner?
In most sectors, yes. The Positive Investment List treats 100% foreign ownership as the default, with limitations specified by exception. Whether a partner is required attaches to your five-digit KBLI code, not to your industry in general, so check the specific code before structuring the company.
Can foreigners invest in Indonesia and own land outright?
They can invest, but they cannot own land outright. Foreign nationals cannot hold Hak Milik, Indonesia’s freehold title, personally or through any structure, and no nominee arrangement changes that. What a foreign investor’s PT PMA can hold is Hak Guna Bangunan, the registered right to build, which is transferable, mortgageable, and accepted by Indonesian banks as loan security.
Can foreigners invest in Indonesia through an industrial estate?
Yes, and for manufacturers it is the usual route. Indonesian industry law directs industrial activity into designated estates, and a plot inside an estate can carry its own HGB, split from the estate’s title and registered to your PT PMA, with zoning conformity already settled at estate level.
How long does HGB last for a PT PMA?
Under PP 18/2021, HGB runs for an initial 30 years, extendable by 20 years, then renewable for a further 30. Extension is not automatic. An application is made to the land agency before expiry, and productive use of the land is assessed as part of it.
Can a PT PMA buy land held as Hak Milik?
It can acquire the parcel, but not the title. Hak Milik is released and re-granted as HGB in the company’s name, because no company may hold freehold. Treat that release and re-grant as a separate step with its own timeline, sitting ahead of your building permit.
What land title would a tenant receive at SIIPE?
HGB, held by your PT PMA. The route depends on the parcel, since land certification across SIIPE is still in process and parcels carry different documents today. Ask our team to confirm the title structure and current status for a specific plot before you sign anything.
Talk to SIIPE’s Investment Team
SIIPE is a planned 5,600-hectare integrated estate and bulk port in Medan Belawan, 4.7 km from Belawan Port on the Strait of Malacca, with roughly 840 hectares acquired and every industrial plot designed to sit within 5 km of the estate’s own planned jetty. It is owned by Internusa, a Medan property developer since 2004, and Asia Capital Pte. Ltd. of Singapore. The port is a medium-term roadmap objective and is not operational.
If you are weighing northern Sumatra against an alternative, the land question is worth resolving early rather than late, because title status and not construction usually sets the first credible handover date. Tell us your sector, your requirement (under 5 Ha, 5 to 20 Ha, 20 to 50 Ha or above 50 Ha) and your timeline, and we will come back with the title position on the relevant parcels alongside current industrial land availability.
Book a call with our investment team, or reach us on WhatsApp at +62 811 860 980 or at info@siipe-port.com. SIIPE provides estate-level licensing and management support. It does not grant government approvals, statuses or incentives, and no developer can.